.com

Permits by city / San Diego / Solar

Solar permits in San Diego, CA

In the four weeks to November 16, 2026, San Diego issued 442 solar permits (about 111 a week), typically $719,173 a job. Each one is a property owner starting work, often before every trade on the job is hired.

111solar permits a week
$719,173typical job value
$13 milliondeclared value, last 4 weeks
31%name a contractor

Per week

  1. 112Oct 20–Oct 26
  2. 129Oct 27–Nov 2
  3. 122Nov 3–Nov 9
  4. 79Nov 10–Nov 16

Busiest ZIP codes

  • 9215444
  • 9212626
  • 9211425
  • 9213025
  • 9203722
  • 9211720

The latest solar permits

IssuedZIPWorkValueContractor
Nov 15—New 200 Amp Solar Ready PanelSolar—Wehrly Electric
Nov 15—5.4KW, 5KWH ESS, (12)Solar Modules, (12)Microinverters, (1)ESS Battery, (1)fused AC Disconnect, (1)Load…Solar——
Nov 15—Battery addition to existing residential solar. 1x7.08kW battery unit and 1 EV Charger. No main panel…Solar, Additions & remodels—Sunlight Solar INC
Nov 15—New 200 Amp Solar Ready PanelSolar—Wehrly Electric
Nov 15—4.10KW, 10KWH ESS, (10)Solar Modules, (10)Microinverters, (1)ESS Battery, (1)IQ Combiner, (2)AC Disconnect,…Solar——
Nov 15—New 200 Amp Solar Ready PanelSolar—Wehrly Electric
Nov 14—Roof Mount PV and ESSSolar——
Nov 1392114Installation of a solar system 28.05 kW system on an MDU.Solar—Sunspired Builders (Derrick Breaux)
Nov 1392114Installation of a solar system 11.55 kW on an existing duplex.Solar—Sunspired Builders (Derrick Breaux)
Nov 1392105For electrical works associated with a proposed (N) carport, including an Energy Storage system with battery…Solar$422,980Sunrun Installation Services INC

Street addresses are left out here; subscribers get the full address, the city's record link and the contractor in every email.

Get new San Diego solar permits every weekdayEvery weekday morning, by email with a spreadsheet: the address, the work, the value and the contractor. From $99/month for San Diego.
Build your alert →

Source: City of San Diego Open Data: Development Permits (approvals issued), updated next day. Counts group permits filed for the same address on the same day. Last permit in this data: November 16, 2026.

Where should we send your permit alerts?

  1. Pay securely with Stripe (your email carries over).
  2. The last 7 days of matching permits arrive within the hour.
  3. Then a new email every weekday morning. Manage or cancel anytime.

By continuing you agree to the Terms of Service and Data Use Policy.